Business Project Management Glossary

 

acceptance acceptance.html
activity definition activity_definition.html
activity duration activity_duration.html
activity duration estimating activity_duration_estimating.html
activity file activity_file.html
activity id activity_id.html
activity relationships activity_relationships.html
activity status activity_status.html
activity-on-node activity_on_node.html
actual cost actual_cost.html
actual dates actual_dates.html
actual direct costs actual_direct_costs.html
actual finish actual_finish.html
actual start actual_start.html
acwp (actual cost of work performed) acwp_actual_cost_of_work_performed.html
adm project adm_project.html
advanced material release (amr) advanced_material_release_amr.html
allocation allocation.html
alternate resource alternate_resource.html
approval to proceed approval_to_proceed.html
archive plan archive_plan.html
arrow diagram method (adm) arrow_diagram_method_adm.html
as-late-as-possible (alap) as_late_as_possible_alap.html
as-soon-as-possible (asap) as_soon_as_possible_asap.html
assumptions assumptions.html
authorized unpriced work (auw) authorized_unpriced_work_auw.html
authorized work authorized_work.html
backward pass backward_pass.html
balanced matrix balanced_matrix.html
bar chart bar_chart.html
baseline baseline.html
baseline dates baseline_dates.html
baseline review baseline_review.html
baseline schedule baseline_schedule.html
batch operations batch_operations.html
bcwp (budget cost of work performed) bcwp_budget_cost_of_work_performed.html
bcws (budget cost of work scheduled) bcws_budget_cost_of_work_scheduled.html
benefits benefits.html
benefits framework benefits_framework.html
benefits management benefits_management.html
benefits management plan benefits_management_plan.html
benefits profiles benefits_profiles.html
bottom up cost estimating bottom_up_cost_estimating.html
brainstorming brainstorming.html
breakdown structure breakdown_structure.html
budget budget.html
budget at completion (bac) budget_at_completion_bac.html
budget cost budget_cost.html
budget cost of work scheduled (bcws ) budget_cost_of_work_scheduled_bcws.html
budget element budget_element.html
budget estimate budget_estimate.html
budget unit budget_unit.html
budgeted cost of work performed (bcwp) budgeted_cost_of_work_performed_bcwp.html
budgeting budgeting.html
burden burden.html
business assurance business_assurance.html
business assurance coordinator business_assurance_coordinator.html
business case business_case.html
c/scs c_scs.html
c/scsc c_scsc.html
calculate schedule calculate_schedule.html
calendar file calendar_file.html
calendars calendars.html
case structure case_structure.html
change control board (ccb) change_control_board_ccb.html
change in scope change_in_scope.html
change request change_request.html
chart of accounts chart_of_accounts.html
child child.html
chunk chart chunk_chart.html
close out close_out.html
code file code_file.html
commitment commitment.html
committed costs committed_costs.html
communication communication.html
communications planning communications_planning.html
completion date completion_date.html
compound risk compound_risk.html
concurrent engineering concurrent_engineering.html
configuration configuration.html
configuration item configuration_item.html
configuration librarian configuration_librarian.html
configuration management configuration_management.html
conflict management conflict_management.html
constraints constraints.html
consumable resource consumable_resource.html
contingency contingency.html
contingency planning contingency_planning.html
contract contract.html
contract budget base contract_budget_base.html
contract close-out contract_close_out.html
contract target cost (ctc) contract_target_cost_ctc.html
contract target price (ctp) contract_target_price_ctp.html
contract work breakdown structure (cwbs) contract_work_breakdown_structure_cwbs.html
control control.html
control and coordination control_and_coordination.html
control charts control_charts.html
controlling relationship controlling_relationship.html
coordinated matrix coordinated_matrix.html
corrective action corrective_action.html
cost cost.html
cost account cost_account.html
cost account manager (cam) cost_account_manager_cam.html
cost account plan (cap) cost_account_plan_cap.html
cost benefit analysis cost_benefit_analysis.html
cost breakdown structure cost_breakdown_structure.html
cost budgeting cost_budgeting.html
cost codes cost_codes.html
cost control point cost_control_point.html
cost control system cost_control_system.html
cost curve cost_curve.html
cost element cost_element.html
cost estimating cost_estimating.html
cost incurred cost_incurred.html
cost management cost_management.html
cost of money cost_of_money.html
cost of quality cost_of_quality.html
cost overrun cost_overrun.html
cost performance index (cpi) cost_performance_index_cpi.html
cost performance report (cpr) cost_performance_report_cpr.html
cost plus fixed fee contract (cpff) cost_plus_fixed_fee_contract_cpff.html
cost plus incentive fee contract (cpifc) cost_plus_incentive_fee_contract_cpifc.html
cost reimbursable contract cost_reimbursable_contract.html
cost reimbursement type contracts cost_reimbursement_type_contracts.html
cost schedule status report (c/ssr) cost_schedule_status_report_c_ssr.html
cost variance (cv) cost_variance_cv.html
cost/schedule control systems criteria (c/scsc) cost_schedule_control_systems_criteria_c_scsc.html
cost/schedule planning and control specification (c/spcs) cost_schedule_planning_and_control_specification_c_spcs.html
crashing crashing.html
critical activity critical_activity.html
critical path critical_path.html
critical path method (cpm) critical_path_method_cpm.html
criticality index criticality_index.html
customer customer.html
cutoff date cutoff_date.html
cv (cost variance) cv_cost_variance.html
dangle dangle.html
data type data_type.html
delaying resource delaying_resource.html
delegating delegating.html
deliverable deliverable.html
delphi technique delphi_technique.html
dependencies dependencies.html
dependency links dependency_links.html
design and development phase design_and_development_phase.html
detailed plans detailed_plans.html
detailed resource plan detailed_resource_plan.html
detailed technical plan detailed_technical_plan.html
deterministic network deterministic_network.html
direct costs direct_costs.html
discontinuous activity discontinuous_activity.html
discontinuous processing discontinuous_processing.html
discrete effort discrete_effort.html
discrete milestone discrete_milestone.html
duration duration.html
duration compression duration_compression.html
eac eac.html
earliest feasible date earliest_feasible_date.html
early dates early_dates.html
early finish early_finish.html
early start early_start.html
earned hours earned_hours.html
earned value earned_value.html
earned value analysis earned_value_analysis.html
earned value cost control earned_value_cost_control.html
earned value management earned_value_management.html
effort effort.html
effort remaining effort_remaining.html
effort-driven activity effort_driven_activity.html
elapsed time elapsed_time.html
end activity end_activity.html
engineering cost estimate engineering_cost_estimate.html
enterprise-wide enterprise_wide.html
estimate estimate.html
estimate at completion (eac) estimate_at_completion_eac.html
estimate to complete (etc) estimate_to_complete_etc.html
estimating estimating.html
etc (estimate to complete) etc_estimate_to_complete.html
event event.html
expenditure expenditure.html
extended subsequent applications review (esar) extended_subsequent_applications_review_esar.html
fast –tracking fast_tracking.html
ff link ff_link.html
filter filter.html
finish date finish_date.html
finish float finish_float.html
finishing activity finishing_activity.html
finish-to-finish lag finish_to_finish_lag.html
finish-to-start lag finish_to_start_lag.html
firm fixed price contract (ffp) firm_fixed_price_contract_ffp.html
fixed date fixed_date.html
fixed finish fixed_finish.html
fixed price contract fixed_price_contract.html
fixed start fixed_start.html
fixed-duration scheduling fixed_duration_scheduling.html
float float.html
forecast at completion (fac) forecast_at_completion_fac.html
forecast final cost forecast_final_cost.html
forward pass forward_pass.html
fragnet fragnet.html
free float free_float.html
fs link fs_link.html
functional manager (fm) functional_manager_fm.html
functional matrix functional_matrix.html
functional organization functional_organization.html
funding profile funding_profile.html
gantt chart gantt_chart.html
gantt, henry gantt,_henry.html
general and administrative (g&a or ganda) general_and_administrative_ganda_or_ganda.html
goal goal.html
hammocks hammocks.html
hard zeros hard_zeros.html
hierarchical coding structure hierarchical_coding_structure.html
highlight report highlight_report.html
histogram histogram.html
holiday holiday.html
hypercritical activities hypercritical_activities.html
immediate activity immediate_activity.html
impact impact.html
impact analysis impact_analysis.html
implementation review or visit implementation_review_or_visit.html
imposed finish imposed_finish.html
imposed start imposed_start.html
in progress in_progress.html
indirect cost indirect_cost.html
individual work plan individual_work_plan.html
informal review informal_review.html
information distribution information_distribution.html
initiation initiation.html
integrated baseline review (ibr) integrated_baseline_review_ibr.html
integrated cost/schedule reporting integrated_cost_schedule_reporting.html
integrated product development teams (ipdt) integrated_product_development_teams_ipdt.html
integration integration.html
international project management association international_project_management_association.html
invitation for bid (ifb) invitation_for_bid_ifb.html
it executive committee it_executive_committee.html
key event schedule key_event_schedule.html
key performance indicators key_performance_indicators.html
kpi kpi.html
labor rate variances labor_rate_variances.html
ladder ladder.html
lag lag.html
late dates late_dates.html
late event date late_event_date.html
late finish late_finish.html
late start late_start.html
leadership leadership.html
level of effort (loe) level_of_effort_loe.html
leveling leveling.html
life-cycle costing life_cycle_costing.html
likelihood likelihood.html
line manager line_manager.html
link link.html
links links.html
logic logic.html
logic diagram logic_diagram.html
logic link logic_link.html
logic loop logic_loop.html
logical relationship logical_relationship.html
loop loop.html
management by project management_by_project.html
management development management_development.html
management reserve (mr) management_reserve_mr.html
master schedule master_schedule.html
material material.html
mathematical analysis mathematical_analysis.html
matrix organization matrix_organization.html
methodology methodology.html
mid-stage assessment mid_stage_assessment.html
milestone plan milestone_plan.html
milestone schedule milestone_schedule.html
milestones milestones.html
military time military_time.html
mission statement mission_statement.html
mitigation mitigation.html
modern project management (mpm) modern_project_management_mpm.html
monitoring monitoring.html
monte carlo simulation monte_carlo_simulation.html
msa msa.html
multi-project multi_project.html
multi-project analysis multi_project_analysis.html
multi-project management multi_project_management.html
multi-user multi_user.html
must finish must_finish.html
must start must_start.html
near-critical activity near_critical_activity.html
negative float negative_float.html
negotiated contract cost negotiated_contract_cost.html
negotiation negotiation.html
network network.html
network analysis network_analysis.html
network diagram network_diagram.html
network logic network_logic.html
network path network_path.html
nonrecurring costs nonrecurring_costs.html
not earlier than not_earlier_than.html
not later than not_later_than.html
objectives objectives.html
offset offset.html
order of magnitude estimate order_of_magnitude_estimate.html
organization design organization_design.html
organizational breakdown structure (obs) organizational_breakdown_structure_obs.html
organizational planning organizational_planning.html
original budget original_budget.html
original duration original_duration.html
other direct costs (odc) other_direct_costs_odc.html
out-of-sequence progress out_of_sequence_progress.html
output format output_format.html
over target baseline (otb) over_target_baseline_otb.html
overall change control overall_change_control.html
overhead overhead.html
overload overload.html
overrun overrun.html
parallel activities parallel_activities.html
path path.html
path convergence path_convergence.html
pdm pdm.html
percent complete percent_complete.html
performance measurement baseline (pmb) performance_measurement_baseline_pmb.html
performance measurement techniques (pmt) performance_measurement_techniques_pmt.html
performance reporting performance_reporting.html
performing performing.html
performing organization performing_organization.html
period of performance period_of_performance.html
pessimistic duration pessimistic_duration.html
phase phase.html
physical percent complete physical_percent_complete.html
placements placements.html
plan plan.html
planned activity planned_activity.html
planned cost planned_cost.html
planning planning.html
planning package planning_package.html
planning stage planning_stage.html
pmi pmi.html
pmp pmp.html
pool resource pool_resource.html
positive float positive_float.html
post implementation review post_implementation_review.html
post project appraisal post_project_appraisal.html
precedence diagram method (pdm) precedence_diagram_method_pdm.html
precedence notation precedence_notation.html
predesessor predesessor.html
predesessor activity predesessor_activity.html
presenter presenter.html
priority rule priority_rule.html
probability probability.html
process process.html
procurement planning procurement_planning.html
product breakdown structure product_breakdown_structure.html
product description product_description.html
product flow diagram product_flow_diagram.html
product realization team (prt) product_realization_team_prt.html
program program.html
program benefits review program_benefits_review.html
program benefits review report program_benefits_review_report.html
program brief program_brief.html
program definition phase program_definition_phase.html
program director program_director.html
program directorate program_directorate.html
program evaluation and review technique (pert) program_evaluation_and_review_technique_pert.html
program execution phase program_execution_phase.html
program executive program_executive.html
program identification phase program_identification_phase.html
program management program_management.html
program management office program_management_office.html
program plan program_plan.html
program status date program_status_date.html
program support office program_support_office.html
progress progress.html
progress payments progress_payments.html
progress reporting progress_reporting.html
project project.html
project appraisal project_appraisal.html
project assurance team project_assurance_team.html
project board project_board.html
project boundary project_boundary.html
project brief project_brief.html
project calendar project_calendar.html
project champion project_champion.html
project charter project_charter.html
project closure project_closure.html
project communications management project_communications_management.html
project cost management project_cost_management.html
project culture project_culture.html
readiness assessment readiness_assessment.html
recurring costs recurring_costs.html
relationship relationship.html
relationship float relationship_float.html
remaining duration remaining_duration.html
replanning replanning.html
report specification file report_specification_file.html
re-profiling re_profiling.html
request for change request_for_change.html
request for proposal (rfp) request_for_proposal_rfp.html
request for quotation request_for_quotation.html
requirements requirements.html
resource resource.html
resource analysis resource_analysis.html
resource assignment resource_assignment.html
resource availability resource_availability.html
resource breakdown structure resource_breakdown_structure.html
resource calendar resource_calendar.html
resource driven task durations resource_driven_task_durations.html
resource histogram resource_histogram.html
resource level resource_level.html
resource levelling resource_levelling.html
resource offset resource_offset.html
resource optimization resource_optimization.html
resource period resource_period.html
resource planning resource_planning.html
resource pool resource_pool.html
resource profile resource_profile.html
resource requirement resource_requirement.html
resource scheduling resource_scheduling.html
resource-limited resource scheduling resource_limited_resource_scheduling.html
resourcing plan resourcing_plan.html
responsibility assignment matrix (ram) responsibility_assignment_matrix_ram.html
responsibility chart responsibility_chart.html
responsibility matrix responsibility_matrix.html
responsible organization responsible_organization.html
retainage retainage.html
reviewers reviewers.html
rfc rfc.html
risk risk.html
risk analysis risk_analysis.html
risk analysis histogram risk_analysis_histogram.html
risk avoidance risk_avoidance.html
risk event risk_event.html
risk identification risk_identification.html
risk management risk_management.html
risk management plan risk_management_plan.html
risk matrix risk_matrix.html
risk prioritizing risk_prioritizing.html
risk quantification risk_quantification.html
risk ranking risk_ranking.html
risk reduction risk_reduction.html
risk register risk_register.html
risk response control risk_response_control.html
risk response development risk_response_development.html
risk transfer risk_transfer.html
risk value risk_value.html
risks risks.html
rubber baselining rubber_baselining.html
schedule schedule.html
schedule compression schedule_compression.html
schedule control schedule_control.html
schedule dates schedule_dates.html
schedule development schedule_development.html
schedule performance index (spi) schedule_performance_index_spi.html
schedule variance schedule_variance.html
scheduled finish scheduled_finish.html
scheduled start scheduled_start.html
scheduling scheduling.html
scope scope.html
scope baseline scope_baseline.html
scope change scope_change.html
scope change control scope_change_control.html
scope definition scope_definition.html
scope of work scope_of_work.html
scope verification scope_verification.html
s-curve s_curve.html
security plan security_plan.html
semi-time-scaled logic drawing semi_time_scaled_logic_drawing.html
senior technical senior_technical.html
senior user senior_user.html
sequence sequence.html
sf link sf_link.html
should-cost estimates should_cost_estimates.html
skill groups skill_groups.html
skills skills.html
slippage slippage.html
smoothing smoothing.html
soft project soft_project.html
soft skills soft_skills.html
solicitation solicitation.html
solicitation planning solicitation_planning.html
source selection source_selection.html
span activity span_activity.html
spending plan spending_plan.html
spending plan adjustments form spending_plan_adjustments_form.html
splitting splitting.html
ss link ss_link.html
stage stage.html
stage assessment stage_assessment.html
stage file stage_file.html
stage manager stage_manager.html
stage resource plan stage_resource_plan.html
stage teams stage_teams.html
stage technical plan stage_technical_plan.html
stakeholders stakeholders.html
start float start_float.html
starting activity starting_activity.html
start-to-finish start_to_finish.html
start-to-start lag start_to_start_lag.html
statement of work (sow) statement_of_work_sow.html
status date status_date.html
status reports status_reports.html
stretching stretching.html
subcontract subcontract.html
subnet subnet.html
subnetwork subnetwork.html
subproject subproject.html
subsequent application review (sar) subsequent_application_review_sar.html
successor successor.html
successor activity successor_activity.html
sunk costs sunk_costs.html
super-critical activity super_critical_activity.html
system system.html
system acceptance letter system_acceptance_letter.html
systems and procedures systems_and_procedures.html
systems management systems_management.html
target completion date target_completion_date.html
target dates target_dates.html
target finish -- activity target_finish_activity.html
target finish -- project target_finish_project.html
target finish date target_finish_date.html
target schedule target_schedule.html
target start -- activity target_start_activity.html
target start date target_start_date.html
task task.html
team team.html
team building team_building.html
team development team_development.html
team leader team_leader.html
team members team_members.html
technical assurance technical_assurance.html
technical assurance coordinator technical_assurance_coordinator.html
technical exception technical_exception.html
technical file technical_file.html
technical guide technical_guide.html
technical products technical_products.html
three duration technique three_duration_technique.html
time analysis time_analysis.html
time now time_now.html
time recording time_recording.html
time recording software time_recording_software.html
time sheet time_sheet.html
time-limited resource scheduling time_limited_resource_scheduling.html
time-scaled logic drawing time_scaled_logic_drawing.html
time-scaled network diagram time_scaled_network_diagram.html
to complete performance index (tcpi) to_complete_performance_index_tcpi.html
tolerability tolerability.html
tolerance tolerance.html
top down cost estimating top_down_cost_estimating.html
total allocated budget (tab) total_allocated_budget_tab.html
total float total_float.html
total quality management (tqm) total_quality_management_tqm.html
tracking tracking.html
transition plan transition_plan.html
triple constraint triple_constraint.html
turnaround report turnaround_report.html
undistributed budget (ub) undistributed_budget_ub.html
user acceptance letter user_acceptance_letter.html
user assurance coordinator user_assurance_coordinator.html
validation validation.html
value value.html
value management value_management.html
variance variance.html
variance at completion (vac) variance_at_completion_vac.html
variance threshold variance_threshold.html
variation order variation_order.html
wbs dictionary wbs_dictionary.html
what-if analysis what_if_analysis.html
work work.html
work breakdown code work_breakdown_code.html
work breakdown structure (wbs) work_breakdown_structure_wbs.html
work flow work_flow.html
work item work_item.html
work load work_load.html
work package work_package.html
work products work_products.html
work units work_units.html
workaround workaround.html
zero float zero_float.html

 

Business Project Management Glossary

 

If you want to quickly find the pages about a particular topic as Business Project Management Glossary use the following search engine:

 

 

Business Project Management Glossary

 

Please visit our home page

 

Larapedia.com Terms of service and privacy page

 

 

 

Business Project Management Glossary